Pain Point
A register anyone can overwrite
The register is a spreadsheet anyone can overwrite. There is no history, no ownership and no way to trust the current version.
The Problem
Trading and industrial groups often manage incidents, controls and risk updates through spreadsheets and inboxes, making ownership, history and aggregate exposure difficult to review.
Pain Point
The register is a spreadsheet anyone can overwrite. There is no history, no ownership and no way to trust the current version.
Pain Point
Incidents go unlogged because there is nowhere to log them. What never gets recorded never gets fixed.
Pain Point
Risk arrives as email somebody has to read in full to work out whether the issue is operational, market or credit. Triage depends on whoever opens the inbox.
Pain Point
Nothing is structured, so nothing can be analysed. There is no trend, no aggregate and no group-level view of exposure.
The Product
Risk Llama turns existing registers into connected records, adds a straightforward incident route and places market monitoring beside the team’s operational risk view.
No Framework Needed
You do not need a framework before you start. Most environments are operational within days to a week, with training included at onboarding and afterwards.


Built for Adoption
The hard part is getting people to log things, and the full system is usually where adoption fails. Risk Llama keeps the wider platform out of most people's way.
See It Connected
The Alignment Map connects your inventory the way you define it. Market Watch scans news, central banks and regulators continuously and sits on the same screen as your risk heat map.

Evidence
The AI Data Room reads submitted documents, classifies them, and assesses them against criteria you write in plain English. RCSA and other control checks run side by side, with results in minutes and a structured findings report at the end. Your team reviews and decides. Risk Llama does the reading.
Minutes
Results on RCSA and control checks
Plain English
Assessment criteria your team writes
Who It Helps
The aim is to make operational risk easier to run, easier to evidence and easier to explain. Your data stays in your tenant with Llama Vault, and never trains our AI.
Replace the spreadsheet register with a live one, and see total exposure at group level for the first time.
Spend less time reading email in full to triage issues. Incidents arrive structured, classified and ready to analyse.
Report an incident from an intranet link or answer a short survey, without ever logging into a platform.
Risk Llama
See how existing registers, incident reporting and market signals can support one operational risk workflow across the group.
Bring one of your spreadsheets and see it become a register. Book a live demo.
One platform, one price. Everything is included rather than sold as modules, so bringing procurement or compliance on later does not trigger new licence fees.